Kişinev Arena, Aquacenter & Tennis Klübü
- Client : Summa Tourism
 - Project : Sports Arena (with a capacity of 14.000 spectators)
 - Construction Area : 24,500 m²
 - Start/Finish Date : July‘18 - June’19
 - Design Stages: Concept Design, Schematic Design, Design Development and Construction Design
 
					PAYLAŞ
						
                
            Proje İçeriği
Designed systems are;
- 0.4 kV Distribution
 - Emergency generation and distribution
 - Functional lighting
 - Fire alarm
 - Fire fighting electrification
 - Public announcement
 - Telephone and data infrastructure, SCS
 - CCTV
 - Access control
 - Intruder alarm
 - SCS (Structured Cabling System)
 - Earthing and lightning protection