Samarkand Airport New Terminal Building, Samarkand-Uzbekistan

  • Client : Kiklop Architecture
  • Project : Airport Main Terminal Building
  • Construction Area : 45,000 m² 
  • Start/Finish Date : Jan'20-Sep'20
  • Design Stages: Concept Design, Schematic Design, Design Development and Construction Design
PAYLAŞ

Proje İçeriği

    Designed systems are; 

  • MV switchgear and transforner stations
  • Backup power generation
  • Earthing and lightning protection 
  • 0.4 kV main and small power distribution
  • Emergency and working lighting
  • Exterior and facade lighting
  • HVAC and fire fighting electric supply
  • Lighting automation
  • Electrical infrastructure for airport specific systems
  • Fire alarm
  • Public announcement
  • Structured cabling system
  • A/V systems
  • IPTV
  • CCTV
  • Security and access control
  • Emergency call system for handicapped