City of Democracy, Libreville - Gabon

  • Client : Summa Tourism 
  • Project : Congress Center, Presidential Palace, Presidential Villas, Zoo and Recreational Areas 
  • Construction Area : 78,350 m² 
  • Start/Finish Date : May'24-Apr'25 
  • Design Stages: Concept Design, Schematic Design, Design Development and Construction Design
PAYLAŞ

Proje İçeriği

Designed systems are; 

  • MV switchgear and transformer stations
  • Backup power generation
  • Earthing and lightning protection 
  • 0.4 kV main and small power distribution
  • Emergency and working lighting
  • Exterior and facade lighting
  • HVAC and fire fighting electric supply
  • Fire alarm
  • Public announcement
  • Structured cabling system
  • Lighting automation system
  • SMATV
  • A/V systems
  • CCTV
  • Security and access control
  • Emergency call system for handicapped