Pasha Holding Data Merkezi Projesi, Bakü Azerbaycan

  • Client : Pasha Holding
  • Project : Datacenter & Disaster recovery site
  • Construction Area : Baku Datacenter whitespace - 1,000 m² Goychay Disaster recovery site whitespace – 600 m²
  • Start/Finish Date : Jan‘19-Apr’19
  • Design Stages: Concept Design, Schematic Design, Design Development and Construction Design
PAYLAŞ

Proje İçeriği

Installed systems are;

  • MV Distribution and Transformer Center
  • Backup Power Generation
  • 0.4 kV Distribution
  • Solar Power System
  • Emergency and Working Lighting
  • Fire Alarm, Gaseous Fire Suppression & Air Sampling System
  • HVAC, CRAH-CRAC and Fire Fighting Electric Supply
  • Public Announcement
  • Structured Cabling System
  • Lighting Automation System
  • Security and Access Control
  • CCTV
  • Emergency Call System for Handicapped
  • Earthing and Lightning Protection