Pasha Holding Data Merkezi Projesi, Bakü Azerbaycan
- Client : Pasha Holding
- Project : Datacenter & Disaster recovery site
- Construction Area : Baku Datacenter whitespace - 1,000 m² Goychay Disaster recovery site whitespace – 600 m²
- Start/Finish Date : Jan‘19-Apr’19
- Design Stages: Concept Design, Schematic Design, Design Development and Construction Design
PAYLAŞ
Proje İçeriği
Installed systems are;
- MV Distribution and Transformer Center
- Backup Power Generation
- 0.4 kV Distribution
- Solar Power System
- Emergency and Working Lighting
- Fire Alarm, Gaseous Fire Suppression & Air Sampling System
- HVAC, CRAH-CRAC and Fire Fighting Electric Supply
- Public Announcement
- Structured Cabling System
- Lighting Automation System
- Security and Access Control
- CCTV
- Emergency Call System for Handicapped
- Earthing and Lightning Protection